Search bioRxiv⌕ Search

bioRxiv · 10.64898/2026.10.21.760765

Dopaminergic reward signals shape foraging decisions through learned value expectations

Abstract

A fundamental function of the nervous system is to direct animals towards life-sustaining resources and enable adaptive strategies for acquiring them. Foraging, the challenge of securing these resources from the environment, requires making decisions that balance local gains against costs, opening a window on value-based decision making in ecological context. Yet despite the centrality of foraging in life, the algorithms and neural mechanisms underlying foraging decisions are not well understood. We studied mice making stay-or-leave patch foraging decisions for water across poor- and rich-resource environments with dynamic local reward outcomes. We found that mice integrate immediate rewards, local reward history, and reward (i.e. value) expectations to guide foraging decisions, favoring greater time investment in rich-environment patches. Computational models revealed influence of a time-varying bias which mirrored the shape of a learned value function. Consistent with a reinforcement learning mechanism, dopamine in the ventral striatum signaled a temporal-difference reward prediction error, which could be used as a teaching signal to construct value functions, and calibrated optogenetic manipulation of dopamine to create fictive reward signals recapitulated the value-related decision bias. Taken together, our results shed new light on the neurocomputational basis of foraging, revealing a novel role for value expectations in dynamic environments. Further, they establish generalized function of biological reinforcement learning in ecological context, demonstrating a specific role for the canonical dopamine reward circuit in shaping temporally resolved value expectations to guide behavior and cognition. The unification of this framework with foraging opens a new avenue to elucidate principles of how animals learn and dynamically adjust cognitive strategies for real-world ecological problems.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Kingsbury, L. E., May, H., Uchida, N.. 2026-10-22. Dopaminergic reward signals shape foraging decisions through learned value expectations. https://doi.org/10.64898/2026.10.21.760765

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related preprints

Brain representations of visual short-term memories during healthy human aging: occipital decline and frontoparietal compensation

Visual short-term memory declines steeply with age, but the link to neural representations of memory content remains unknown. We used fMRI decoding to relate remembered motion-direction representations in visual and frontoparietal cortex to age and performance, in 115 adults, aged 25-87, from the Cambridge Centre for Ageing and Neuroscience (Cam-CAN) cohort. Decoding was strongest in visual cortex, but also significant in frontoparietal regions, with different profiles. Visual representations weakened with memory load and age, and statistically mediated age-related performance decline, especially during recall. This coupling, however, weakened with age: some older adults retained stronger visual representations than performance implied, suggesting impaired access to a partially preserved memory trace. Frontoparietal representations, instead, were largely insensitive to load and strengthened with age during maintenance, partially offsetting performance decline. Therefore, interventions to boost VSTM in older adults might target compensatory frontoparietal representations during memory maintenance, and readout of untapped visual representations at recall.

neuroscience↗

Lexical surprisal drives pupil dilation during continuous story listening

The pupil famously adjusts its dilation in response to light, but its role extends far beyond this basic sensory function. Its fluctuations index arousal and mental effort, beyond luminance-related dynamics, making it a sensitive marker of internal cognitive states. A growing body of work shows that these pupil-linked signals extend beyond the visual domain. However, which processes drive pupil responses in more naturalistic settings remains unclear as most evidence comes from tightly controlled paradigms that strip away the richness of real-world experience. Language offers a uniquely powerful window into this question, as it can allow us to create rich paradigms without having any visual, i.e. luminance, confounds. Moreover, language comprehension hinges on continuous prediction: listeners constantly generate expectations about upcoming input, and the discrepancy between expectation and actual input - contextual prediction error, or surprisal - carries measurable cognitive costs. Here, we tested the hypothesis that pupil-linked arousal indexes these linguistic surprisal signals during naturalistic listening. We recorded pupil responses while volunteers listened to naturalistic spoken stories in darkness, which were either intact or reversed. Reversed speech preserves the acoustics of the signal while destroying its intelligibility. Pupil dilation selectively tracked lexical surprisal within a late window of 1,700 to 2,350 milliseconds following word onset, in forward, but not control, backward speech. These findings indicate that pupil-linked arousal is tuned to global, context-dependent processing, tracking the cognitive cost of updating a predictive model during naturalistic listening.

neuroscience↗

Disrupting SORL1-retromer endosomal recycling in mice drives the age-dependent neurodegenerative signature of Alzheimer's disease

MRI studies have mapped the atrophic signature that distinguishes Alzheimer's disease (AD), isolating regions differentially vulnerable to its age-dependent neurodegenerative process. We test the hypothesis that an endosomal recycling pathway regulated by the interaction of SORL1 with retromer, which is pathogenically disrupted in AD, might drive the neurodegenerative process via multiple yearlong studies in over 140 wildtype and SORL1 deficient mice, modeling AD's causative mutations. MRI studies revealed that SORL1 deficiency induced an age-dependent AD-pattern of atrophy, centered on the trans-entorhinal cortex, and that atrophy was prevented by SORL1 restoration, secondary to overexpressing the retromer protein VPS26b. Postmortem studies validated that the atrophy reflects neuronal loss. Proteomic profiling revealed that the atrophy is associated with reductions in cell death suppressors, one of which was then found deficient in the trans-entorhinal cortex of AD patients. Besides supporting the hypothesis, taken together with other findings, the results suggest that SORL1-retromer disruptions represent a therapeutically-amenable common 'neurodegeneration pathway' in AD.

neuroscience↗