Search bioRxiv⌕ Search

bioRxiv · 10.1101/2024.11.21.624694

Heterologous expression of critical pathway genes leads to complex pattern of increased yield of bioplastic precursors in Paraburkholderia sacchari ITP 101

Abstract

Recent research endeavors have turned to sustainably generating useful chemicals from biological platforms. However, conventional model organisms, such as Escherichia coli and Saccharomyces cerevisiae, face limitations, particularly in terms of substrate range and yield for certain metabolites. In this study, we share our work toward the development of the non-model bacterium, Paraburkholderia sacchari (hereafter P. sacchari), as a microbial factory for the production of polyhydroxyalkanoates (PHAs), which are precursors for biodegradable plastic. The particular PHAs of interest produced by P. sacchari include poly(3-hydroxybutyrate) (PHB) and the co-polymer produced by the combination of PHB and 3-hydroxyvalerate (3HV) called poly(3-hydroxybutyrate-co-3-hydroxyvalerate) (PHBV). P. sacchari produces PHB from mixtures of hexose and pentose sugars commonly found in lignocellulosic biomass, however PHBV requires co-feeding with propionate. Both plastic precursors have industrial interest, so both PHB and 3HV were chosen as production targets. Due to studies in other bacteria demonstrating PHB yield can be improved by overexpressing genes for critical pathway enzymes, we hypothesized there is a bottleneck in the production pathway leading to PHB in P. sacchari as well. To explore this, heterologous genes coding for the three critical enzymes were taken from Cupriavidus necator H16 (hereafter C. necator) and inserted via plasmid; phaA and bktb (homologous genes for {beta}-ketothiolase), phaB (acetyl-CoA reductase), and phaC (PHA polymerase). PHB production increased following overexpression of phaB, indicating acetoacetyl-CoA as the limiting enzyme. In fact, overexpression of phaB with the synthetic Anderson promoter, BBa_J23 104, increased titer by 162% over wildtype. On the other hand, strategies to improve 3HV had mixed results. Heterologous overexpression of propionyl-CoA transferase (pct from C. necator), which converts propionate into propionyl-CoA-the starting substrate for the 3HVproduction, showed a 145% increase in 3HV. Yet, internal sourcing of propionyl-CoA from succinyl-CoA following introduction of the sleeping beauty mutase (sbm) operon from E. coli showed no 3HV production. To this end, Max/Min Driving Force (MDF) thermodynamic analysis of critical PHBV pathways revealed two major limitations of 3HV production: 1) internal sourcing is not thermodynamically favorable; and 2) recycling of propionyl-CoA through the methyl citrate cycle (MCC) is more favorable than 3HV formation. Overall, we have shown promising progress and suggest future directions toward an industrially useful strain of P. sacchari for PHB and PHBV production. Graphical abstract O_FIG O_LINKSMALLFIG WIDTH=200 HEIGHT=71 SRC="FIGDIR/small/624694v1_ufig1.gif" ALT="Figure 1"> View larger version (20K): org.highwire.dtl.DTLVardef@1942ebaorg.highwire.dtl.DTLVardef@187ec83org.highwire.dtl.DTLVardef@b8b439org.highwire.dtl.DTLVardef@4015d6_HPS_FORMAT_FIGEXP M_FIG C_FIG HighlightsParaburkholderia sacchari has interest as a bioproduction platform for PHAs from complex feedstocks. Removal of PHA pathway bottleneck increases PHB yield by 162%. Improved conversion of fed-in propionate increases 3HV yield by 145%. Internal sourcing of propionyl-CoA does not successfully yield 3HV. Thermodynamic analysis provides insight into difficult conversion of propionyl-CoA to 3HV.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Morris, D., Chowdhury, N. B., Immethun, C., Saha, R.. 2024-11-22. Heterologous expression of critical pathway genes leads to complex pattern of increased yield of bioplastic precursors in Paraburkholderia sacchari ITP 101. https://doi.org/10.1101/2024.11.21.624694

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related preprints

RNASeek: A Cross-Phyla Generative Foundation Model for Multipurpose RNA Modeling and Reinforcement Learning-Based Design

RNA plays central roles in regulating information flow and provides a versatile substrate for engineering biological functions. While large language models (LLMs) have transformed natural language processing and protein design, a general framework connecting RNA foundation models to functional sequence design remains limited. Here, we present RNASeek, a 1.6-billion-parameter generative foundation model built on a DeepSeek architecture and trained on a cross-phyla transcriptomic corpus for RNA sequence representation and generation. Natural-language tokens enable flexible conditional prediction and sequence design using a unified backbone. RNASeek captures species-specific transcript features and intron-exon boundaries in a zero-shot setting. We then fine-tune RNASeek to predict ribozyme self-cleavage activity and viral mRNA stability, revealing interpretable sequence features associated with function, including ribozyme loop flexibility and stem stability, as well as AU-rich motifs associated with mRNA stability. We use these functional predictors as reward models and apply Group Relative Policy Optimization (GRPO) to update the generation policy of RNASeek toward sequences with desired properties. GRPO-guided generation produces faster-cleaving ribozymes and stability-enhancing 3' UTRs while satisfying user-specified IUPAC constraints. Experimentally validated RNASeek-generated ribozymes achieve wild-type levels of activity, while RNASeek-generated 3' UTR sequences exceed the performance of the training data and benchmarked AI-generated 3' UTRs. Together, RNASeek establishes a unified pretrain-predict-optimize framework that connects learned RNA function to controllable de novo sequence design and provides a general strategy for engineering regulatory RNAs with desired properties.

bioengineering↗

Joint Vector Flow Mapping and Segmentation: Ill-Posedness,Differentiable Bayesian Inference, and Synthetic Vortex-FlowBenchmarks

Vector flow mapping (VFM) reconstructs left-ventricular (LV) blood velocity from color-Doppler echocardiography by combining the measured beamwise component with physical and regularizing constraints. Analysis of the discrete VFM formulation shows that the inverse problem is intrinsically ill posed: the occurrence of singular modes can be predicted from the geometry of the segmented blood-pool domain, the imposed boundary conditions, and the degree of smoothing. These modes can propagate uncertainty along entire transverse bands of the reconstructed velocity field, yet conventional VFM neither quantifies this uncertainty nor allows for correcting the blood-pool segmentation. We introduce Bayesian VFM (B--VFM), a hierarchical framework that jointly infers radial and transverse velocities, a probabilistic blood-pool mask, their spatially resolved uncertainties, and hyperparameters weighting Doppler and segmentation fidelity, mass conservation, boundary conditions, and smoothness. The discretized posterior admits a closed-form gradient and exact Hessian, enabling computationally efficient, gradient-based MAP estimation, sampling, and direct analysis of ill-posed modes. Posterior inference combines Gibbs sampling of conjugate Gamma-distributed hyperparameters with conditional maximum-a-posteriori estimation and a Laplace approximation for the high-dimensional velocity and mask fields. To accommodate systematic departures from planar mass conservation, B-VFM can learn the covariance of the planar divergence residual from an ensemble of flows and incorporate it as a structured model-discrepancy prior. Independent chains converged reproducibly, while covariance priors learned from flow ensembles illustrated how model discrepancies can be incorporated into the inference. B--VFM was evaluated using Lamb-Chaplygin dipoles under ideal conditions and with Doppler corruption, Doppler voids, and segmentation defects, and using the Hicks-Moffatt family of spherical vortices to assess violations of planar mass conservation. The method produced smooth reconstructions, localized uncertainty near unreliable measurements and regions of model inconsistency, and used flow information to correct segmentation errors. Within the tested vortex family, the data-informed planar divergence prior reduced velocity bias and mask distortion. B--VFM thus provides an uncertainty-aware reconstruction method and a flexible foundation for future VFM formulations incorporating additional priors, observations, and physical models. Future work will evaluate the method using clinical data and more complex three-dimensional benchmark flows.

bioengineering↗

Computational design of a versatile, zero-radius proximity labeling enzyme

The ability to map protein interactomes and organelle proteomes is foundational for achieving a molecular understanding of living cells. Proximity labeling (PL) provides a powerful strategy for this, but existing enzymes and photocatalysts are limited by their spatial resolution, reliance on biotin, and/or in vivo compatibility. Here we report FlexID, an engineered promiscuous ligase that catalyzes the rapid attachment of diverse small-molecule probes to proximal endogenous proteins. Critically, FlexID operates through a zero-radius, direct-contact mechanism, offering superior spatial precision compared to existing PL tools. We engineered FlexID by combining the strengths of sequence- and structure-trained computational models to enhance its catalytic activity and structural stability. Biophysical analysis revealed that specific conformational changes in FlexID improve its ability to recognize diverse target proteins while simultaneously preventing the premature release of the reactive intermediate. We demonstrate FlexID's versatility through in vivo proximity labeling, comprehensive organelle proteome mapping, and a high-throughput, fluorescence-based screen for molecular glues. Our work shows that computational methods can be harnessed to create mechanistically distinct PL enzymes and establishes FlexID as a flexible, high-resolution tool for mapping protein interactions and proteomes in living cells.

bioengineering↗