Search bioRxiv⌕ Search

bioRxiv · 10.1101/2021.10.22.465536

Enterotoxigenic Escherichia coli degrades the host MUC2 mucin barrier to facilitate critical pathogen-enterocyte interactions in human small intestine.

Abstract

Enterotoxigenic Escherichia coli (ETEC) are a genetically diverse pathologic variant of E. coli defined by the production of heat-labile (LT) and/or heat-stable (ST) toxins. ETEC are estimated to cause hundreds of millions of cases of diarrheal illness annually. However, it is not clear that all strains are equally equipped to cause disease and asymptomatic colonization with ETEC is common in low-middle income regions lacking basic sanitation and clean water where ETEC are ubiquitous. Recent molecular epidemiology studies have revealed a significant association between strains which produce EatA, a secreted autotransporter protein, and the development of symptomatic infection. Here, we demonstrate that LT stimulates production of MUC2 mucin by goblet cells in human small intestine, enhancing the protective barrier between pathogens and enterocytes. In contrast, using explants of human small intestine as well as small intestinal enteroids, we show that EatA counters this host defense by engaging and degrading the MUC2 mucin barrier to promote bacterial access to target enterocytes and ultimately toxin delivery suggesting that EatA plays a crucial role in the molecular pathogenesis of ETEC. These findings may inform novel approaches to prevention of the acute diarrheal illness as well as the sequelae associated with ETEC and other pathogens that rely on EatA and similar proteases for efficient interaction with their human hosts.

Source connections

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Sheikh, A., Wangdi, T., Vickers, T. J., Aaron, B., Palmer, M. P., Miller, M., Kim, S., Herring, C., Simoes, R., Crainic, J. A., Gildersleeve, J., van der Post, S., Hansson, G. C., Fleckenstein, J. M.. 2021-10-23. Enterotoxigenic Escherichia coli degrades the host MUC2 mucin barrier to facilitate critical pathogen-enterocyte interactions in human small intestine.. https://doi.org/10.1101/2021.10.22.465536

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related preprints

Diabetes-associated lung physiology shapes Klebsiella pneumoniae infection dynamics

Type 2 diabetes mellitus (T2DM) is associated with increased susceptibility to bacterial pneumonia, yet the mechanisms by which diabetic host physiology influences pathogen establishment remain incompletely understood. Here, we investigated how diabetes-associated changes in the lung environment influence Klebsiella pneumoniae infection using leptin receptor-deficient (db/db) mice. Following acute lung infection, db/db mice exhibited increased bacterial burdens compared to nondiabetic controls, despite mounting a robust inflammatory cytokine response. Elevated pulmonary vascular endothelial growth factor concentrations were accompanied by alterations in the bronchoalveolar lavage fluid (BALF) metabolite profile, including enrichment of several amino acids and related metabolites. Consistent with increased nutrient availability, K. pneumoniae exhibited enhanced growth in BALF from db/db mice, and a glutamate-auxotrophic mutant demonstrated improved fitness during pulmonary infection. Using a barcoded K. pneumoniae library, we found that db/db mice supported significantly larger initial founding populations, leading to increased bacterial burden in the lungs. Increased founding populations were also observed in the liver and coincided with proportionally wider infection bottlenecks in the lung. Together, these findings demonstrate that diabetes-associated changes in lung physiology coincide with increased nutrient availability and reduced restrictions on bacterial establishment, highlighting bacterial founding population size as a distinct determinant of pneumonia susceptibility in T2DM.

microbiology↗

H9N2 avian influenza virus in Bangladesh: three genetically distinct co-circulating subgroups retain a largely conserved antigenic phenotype

Low pathogenic avian influenza (LPAI) H9N2 viruses are endemic in poultry across Bangladesh, causing substantial economic losses and posing a persistent zoonotic risk. Although genetic surveillance has documented ongoing viral evolution, the relationship between genetic diversification and antigenic change remains poorly understood. This study investigated the genetic diversity, reassortment, and antigenic characteristics of contemporary H9N2 viruses circulating in Bangladesh. Phylogenetic analysis of 219 sampled sequences revealed three genetically distinct monophyletic haemagglutinin (HA) G-lineage sub-groups, each characterised by unique amino acid substitutions. In contrast, neuraminidase (NA) displayed similar genetic diversity without distinct phylogenetic clusters. A dual-metric analysis of paired HA and NA phylogenies identified 20 putative reassortant H9N2 viruses. Further analysis showed that genetic diversity was geographically structured; however, all three HA subgroups co-circulated across multiple regions, and some live bird markets contained representatives of all three groups simultaneously, suggesting that live bird markets may facilitate mixing between genetically distinct viruses, and create opportunities for reassortment among otherwise geographically separated strains. Despite substantial genetic diversity and reassortment, all viruses remained antigenically similar based on haemagglutination inhibition and virus neutralisation assays. However, a representative strain from one subgroup induced significantly lower homologous and heterologous antibody titres, suggesting reduced immunogenicity. Our findings demonstrate a notable disconnect between genetic evolution and antigenic change in Bangladeshi H9N2 viruses. While reassortment and genetic diversification continue to shape viral populations, antigenic properties remain largely conserved, supporting the continued relevance of current vaccine strategies while highlighting the importance of ongoing genetic and antigenic surveillance.

microbiology↗

Optimizing Avian Influenza Viral RNA Enrichment from Water: A Comparison of Concentration Methods for Low-Volume Samples

Feed-baited water bins may provide a complementary approach for avian influenza virus (AIV) surveillance in wild waterbird populations. In a previous study, water from these bins was sampled using swabs after exposure to visiting birds, but the low sample volume limited the detection and subsequent characterization of AIV RNA (F. I. Rondi, J. Neumann-Heise, T. Harder, V. Allendorf, K. Depner, T. Homeier-Bachmann, L. Breuer, S. Knauf, S. Dreyer, and A. Globig, One Health 23:101548, 2026, https://doi.org/10.1016/j.onehlt.2026.101548). Here, we compared five sample-processing methods for improving AIV RNA detection in small (40-mL) water samples (tap and brackish water) spiked with an AIV of the H4N6 subtype under simulated field conditions: swab sampling, polyethylene glycol precipitation, activated carbon capture, combined activated carbon capture and polyethylene glycol precipitation (AC/PEG), and electronegative membrane adsorption (EM). AC/PEG and EM showed the strongest overall performance based on RT-qPCR results, although their relative performance varied across experimental conditions. The qPCR-derived viral signal was generally higher in tap water than in brackish water, whereas wheat presence was associated with a lower signal, particularly for swab sampling. Subsequent testing was conducted to ascertain the most effective storage conditions with regard to temperature and duration. During storage, AIV RNA detection remained relatively stable at minus 20 degrees Celsius for up to four weeks, with only minor increases in mean Ct values in both water matrices. Greater increases were observed at room temperature and 4 degrees Celsius, with significantly higher Ct values at both temperatures than at minus 20 degrees Celsius in both water matrices at Weeks 2 and 4 (p < 0.05). These findings support the potential of AC/PEG and EM to facilitate the recovery, detection and subsequent characterization of AIV from low-volume water samples by improving viral RNA detection using RT-qPCR. Given its overall performance and lower cost compared with EM, AC/PEG may represent a practical option for field-based surveillance. Regarding storage, minus 20 degrees Celsius provided the best conditions for maintaining AIV RNA detection, with relatively stable results for up to four weeks.

microbiology↗